Current Visitor

This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Isnin, 31 Mac 2014

Maklumat Mengenai Jalan-jalan Jabatan Kerja Raya (JKR) Malaysia


Isnin, 24 Mac 2014

Buku Pengurusan Keselamatan Projek Pembinaan



HARGA BUKU : RM 55.00. BERMINAT SILA WASSAP 012 387 5655 UNTUK KETERANGAN LANJUT

Ahad, 2 Mac 2014

SEKILAS FAKTA JAMBATAN KEDUA PULAU PINANG


Jambatan Pulau Pinang Kedua, yang mengambil masa kira-kira enam tahun untuk dibina, bakal dilancarkan pada hari ini 1 Mac 2014  oleh Perdana Menteri Dato' Sri Najib Abdul Razak

Jambatan yang dibina dengan kos RM4.5 bilion merentangi sepanjang 24 km dengan 16.9km di atas laut, akan menghubungkan Batu Kawan di tanah besar dan Batu Maung di Pulau.

Ia dijangka dapat mengurangkan 25 peratus kesesakan trafik di Jambatan Pulau Pinang.

Berikut adalah fakta-fakta menarik tentang jambatan tersebut.

1. Kos Pembinaan Jambatan Kedua Ialah RM 4.5 Bilion
2. Menghubungkan Kawasan Batu Maung Ke Batu Kawan
3. Pembinaan bermula tahun 2008 dan siap dibuka pada 1 Mac 2014
4. Panjang Jambatan Ialah 24 kilometer
5. Pemaju Projek ialah Jambatan Kedua Sdn Bhd  (JKSB)
6. Dikenali sebagai Jambatan Sultan Abdul Halim Muadzam Shah 


Sabtu, 22 Februari 2014

Kerja-Kerja Side Slope Protection

Kerja side slope protection perlu dilakukan di kebanyakan kawasan projek terutamanya untuk kerja pembinaan jambatan disebelah bawah struktur abutment bagi mengelakkan berlaku hakisan pada slope.

Bahan yang biasa digunakan untuk kerja slope protection adalah batu dari bersaiz besar dan dikemaskan menggunakan simen mortar.

Isnin, 10 Februari 2014

Structural Steel Handbook



All technical data, weights and measures shown in this handbook will be governed by standards of the respective specifications so offered. Care has been taken to ensure that all data and information herein is factual and the numerical values are accurate to the best of knowledge. Yick Hoe Companies assumes no responsibility for errors in or misinterpretation of the information contained in this handbook or in its use.

UNTUK MENDAPATKAN SILI KLIK DI SINI



kredit kepada : http://jurukurbahan.blogspot.com/

Jumaat, 7 Februari 2014

Hebahan Kursus ~ Kursus kaedah Mencuci, Membersih Dan Menyelia Bagi Kontrak Mencuci Bangunan Dan Membersih Kawasan




Dynamic Excellent Consultant (DEC) akan menganjurkan 

Kursus kaedah Mencuci, Membersih Dan Menyelia Bagi Kontrak Mencuci Bangunan 

Dan Membersih Kawasan pada 8 Mac  2014.


Yuran Pendaftaran: RM 250.00 Per Pax


Lokasi: Politeknik Seberang Perai, Pulau Pinang



Sekiranya berminat untuk dapatkan borang sila 

sms/wassap/viber kepada En Azilan 012 387 5655

Khamis, 6 Februari 2014

Hebahan Kursus~ Kursus Microsoft Project pada 29 Mac dan 30 Mac 2014.



Dynamic Excellent Consultant (DEC) akan menganjurkan 

Kursus Microsoft Project pada 29 Mac dan 30 Mac 2014.


Mata ccd dari cidb disediakan

Yuran Pendaftaran: RM 650.00 Per Pax


Lokasi: Shah Alam


Terhad kepada 30 orang sahaja


Sekiranya berminat untuk dapatkan borang sila 

sms/wassap/viber kepada En Azilan 012 387 5655